Document

Improvements Description and Analysis 44

Ref IMAGES-005-HOUSE_OVERSIGHT_018855.txt Release House Oversight Committee — Epstein Estate Records (Nov 2025) 1 pages

Epstein Suite indexes the text; the original document lives at its official source. We don't host the original file — view it on the official release to read it in full.

View the original on the official release

Document text

Text is machine OCR and may contain errors. Confirm against the original source above.

Improvements Description and Analysis 44 Improvements Analysis — Building Improvements Quality and Condition The quality and condition of the subject is considered to be superior to that of competing properties. The interior and exterior building improvements are considered to be of good quality and in good condition based on our inspection. Functional Utility The improvements appear to be adequately suited to their current use, and there do not appear to be any significant items of functional obsolescence. Deferred Maintenance A few items of deferred maintenance were identified during our inspection and based on discussions with management. These include repairs and replacement to the parking garage ceiling, replacing the wooden deck on the upper level Building A, and re-facing various portions of the marina jettys. Note that a detailed description of the marina improvements will be discussed in the following section of this report. To estimate the cost to cure deferred maintenance, we rely on construction estimates from management as shown below. Deferred Maintenance Item Estimated Cost Parking garage ceiling $40,000 Wooden deck repair/replacement $25,000 Marina decking and fendering repair/replace $96,000 Total $161,000 *Values expressed in United States Dollars Planned Capital Expenditures From 2013 to 2015, a total of $771,460.93 has been spent on various capital expenditures. The major improvements over the past three years were $84,088 for exterior column replacement, $62,172 for security cameras, $62,013 for marina bathrooms, and $281,950 for hand rail replacement. Upcoming expenditures for various capital items considered to be necessary are identified in the following table. To estimate the amounts of these expenditures, we rely on discussions with management. Estimated capital expenditures are as follows. IGY American Yacht Harbor Marina HOUSE_OVERSIGHT_018855

Have a question about what this document contains?

Ask the documents